Harding Case Study
One of the first Dropped Object Prevention programmes developed by the drilling crew on the Harding platform in the UKCS. This provided much of the foundation for the DROPS Workpack.
- File Type
- Zipped PDF
- File Size
- 3 MB
- Date
- 30 Jul 2010