Subsea Dropped Project - Engineering Analysis
Eliminating subsea dropped objects using a subsea installation analysis which simulates an asset during the move from vessel to subsea location. On the impact side of this, the model shows component stress, deflection etc. The computer model looks at fluid dynamics and subsequent loading which can determine where an object can land on the seabed.
- File Type
- File Size
- 442 KB
- Date
- 12 Sep 2012